| Workshop on Visual Basic 6.0 | | | | processing, multiprogramming etc. |
| Project Name: Bank Automation | | | | 3. Choice of Configuration: Wide ranges of peripherals |
| In Guidance of: | | | | are available for many computer systems, which allow |
| ( ) | | | | business organization to select those which most suit |
| Ms Prabhjot Kaur | | | | its processing requirements. |
| (Faculty PCTE) | | | | 4. Storage capacity: Large volumes of data can be |
| Prepared By: | | | | conveniently stored, accessed and altered. |
| Danish Kanojia | | | | 5. Management information: They can be used to |
| Class : BCA ‘2' B | | | | provide useful information of management for control |
| Place: Punjab College of Technical Education, Jhande | | | | and decision making. |
| Contents | | | | 6. Data Processing: Computer has lifted the heavy |
| Project Introduction | | | | data processing constraint with the manual system |
| Problem Identification | | | | and has opened up new avenues for planning, control |
| - What is the existing System? | | | | and data experimentation. |
| - Advantages & Disadvantages | | | | 7. Volume: Computers can store volumes of data and |
| - Proposed System | | | | can retrieve the desired information quickly. |
| - Advantages | | | | 8. Database: Computer facilities the establishment of |
| - Future Scope Of Projects | | | | database. Such a database integrates data records |
| Feasibility Study | | | | and reduces data redundancy. |
| - Technical Feasibility | | | | 9. Reduction in paper work: The use of computers for |
| - Behavioral Feasibility | | | | data processing has helped the management of |
| - Economical Feasibility | | | | business organizations to cope with increasing problem |
| Requirements Analysis | | | | of paper handling. |
| - Input | | | | Future Scope: |
| - Output | | | | As the Competition in Every field is increasing and |
| - Process | | | | need of information is also increasing so the |
| Structured Analysis | | | | organization is required to maintain its information in a |
| - Database Design | | | | well organized manner such that access to that |
| - Tools Used | | | | information should be convenient to authorized |
| - Zero Level DFD | | | | persons. |
| Project Introduction | | | | Hence computerization will help the organization to |
| This Project is a Bank Automation System which will | | | | achieve its goal. |
| help in computerizing the banking job and hence will | | | | ========================== |
| make the job easy and efficient. | | | | Feasibility Study |
| HSBC (Honkong Shangai Banking Corporation) Bank is | | | | After analyzing the organizations budget and other |
| required to use this system (Assumed). | | | | capacities following is the feasibility report. |
| Proper security constraints and accounts management | | | | Technical Feasiblity: |
| is taken into consideration via computerized database | | | | Technically the computerization is feasible as the |
| management system. | | | | organization satisfies the technical system's |
| In these Report Comparisons between Present | | | | requirements like |
| system and the proposed system is done. The | | | | - 10 to 15 computer having 20 GB HDD |
| feasibility study is done to check the affordability of the | | | | and 128 MB of RAM |
| system by the organization. | | | | - Proper Power Supply |
| ------------------------------------------- | | | | Behavioral Feasibility: |
| Problem Identification | | | | Behaviorally the computerization is feasible as the |
| Existing System: | | | | organization satisfies the Behavioral system's |
| Presently the organization is using a manual system. | | | | requirements like |
| Customer's accounts are handled with the help of | | | | - 1 Person per PC having Basic |
| registers and files. | | | | Knowledge of Computers |
| Advantages: | | | | Economical Feasibility: |
| - The Manual System is Economical in | | | | Economically the computerization is feasible as the |
| use. | | | | organization has a sound Budget. |
| - The Manual System does not require | | | | ============================= |
| much User Training. | | | | Requirement Analysis |
| - The Manual System is Traditional | | | | Input |
| & Conventional. | | | | Login Form: A Valid Username and Password. |
| Disadvantages: | | | | Creation and Deletion of Account: Account number of |
| - Searching and Sorting of Data is highly | | | | customer and Customer's Name. |
| time Consuming. | | | | View/Withdraw/Deposit: Account number of |
| - Maintenance of Data Stored in form | | | | Customer. |
| of Files and Registers is Expensive. | | | | Output |
| - Storage capacity of manual System is | | | | Output will be as per the Input |
| limited. | | | | Process |
| - Increase in the volume of data | | | | Processing is done in consideration of input and the |
| increases complexity. | | | | data stored in the database. |
| - Bulk of files and folders require space | | | | Structured Analysis |
| to store. | | | | Database Design: |
| - Manpower requirement is large | | | | The Database which is used to support the Application |
| Proposed System: | | | | is totally based upon Microsoft Access. |
| The Proposed System for the Automation of the | | | | It consists of Two Tables which are as follows: |
| Bank is a Computerized banking system which will | | | | Security: It Consists of all the usernames and there |
| Take care of the Accounting information and | | | | respective Passwords. |
| Transactions. | | | | Accounts: It Consists of the data regarding all the |
| Advantages: | | | | Accounts like account number, customer name and |
| Following are the advantages of the Proposed | | | | current amount. |
| Computer aided system: | | | | Tools Used: |
| 1. Speed: Computerization helps in processing the data | | | | The Application is developed using the following tools: |
| placed in several data files in no time. | | | | Microsoft Visual Basic 6.0 |
| 2. Accuracy: The data processed by the computer | | | | Microsoft Access Database |
| are highly accurate. The programs written on the | | | | NOTE: |
| system checks and controls data before and during | | | | Integration, Testing, Final Review & User Training is |
| processing. Flexibility: The modern digital computers can | | | | completed. The System is ready to Implement. |
| be used for a variety of purposes. E.g. online | | | | |